激情刺激肉无码亚洲另类,真不卡影视app软件下载,小婷又软又嫩又紧水又多,summertime

China wind power installed capacity growth in the world's first Abandoned wind power rationing problem will be resolved in 3 years

Time:2015-12-15

China wind power installed capacity growth in the world's first

Abandoned wind power rationing problem will be resolved in 3 years

Danish industry advisory body BTM recently predicted that 2014~2018 five years, the cumulative installed capacity of wind power in the world will be increased by an average of 12.1% per year (including offshore wind power). China will continue to maintain the position of the top of the new capacity each year, followed by the United States.

2014 -2018 years, the continent accounted for the proportion of the total installed capacity of 48.2% in Asia, 27.4% in Europe, 18.8% in the Americas, and about 5.6% in the rest of the region.

2014 -2016 three years, the average annual new installed capacity of 12 million kilowatts, after the sea wind power will force to help the European wind power installed at a faster rate of growth. Germany and the United Kingdom is still the main wind power market in europe. Emerging markets such as Romania, Turkey, Poland, Sweden, Finland, Austria and other countries of the wind power installed will continue to develop. Data show that Chinese abandoned wind power rationing problem will be resolved in 2017 or 2018.




Back

All rights reserved:www.028rjbg.com/ 津ICP備12000015號-1

Website technical support:Tianjin WenShuai Technology Co., Ltd.

主站蜘蛛池模板: 西宁市| 攀枝花市| 清涧县| 临沂市| 巩留县| 安溪县| 灵寿县| 博兴县| 桑日县| 景泰县| 连平县| 安岳县| 喀什市| 安阳县| 沙坪坝区| 军事| 盐城市| 东乡县| 上思县| 遂宁市| 兴仁县| 当涂县| 景德镇市| 祁东县| 波密县| 文登市| 吴川市| 惠水县| 张家港市| 上饶市| 皮山县| 府谷县| 临清市| 德令哈市| 玛纳斯县| 观塘区| 芒康县| 布拖县| 天台县| 长治县| 双江|